Language · EN

CPC(D)40 vs CPC(D)50

Two sizes of the same frame. The difference that decides the order is usually aisle width or the weight of a full pallet — not the number on the plate.

CPC(D)40CPC(D)50
ModelCPC(D)40CPC(D)50
Rated capacity4 t5 t
EngineYunnei 4JB1, 45 kW, Stage VYunnei 4JB1T, 55 kW, Stage V
Lift height3,000 mm standard; 4,500 / 6,000 mm optional3,000 mm standard; 4,500 / 6,000 mm optional
Turning radius2960 mm3150 mm
Length4360 mm to fork face4550 mm to fork face
Width1330 mm1330 mm
Operating weight5930 kg6750 kg
capacity1.5 t1.5 t
engineXinchai C490BPG, 36.8 kW, Stage VXinchai C490BPG, 36.8 kW, Stage V
liftHeight3,000 mm standard; 4,500 / 6,000 mm optional3,000 mm standard; 4,500 / 6,000 mm optional
turningRadius2485 mm2485 mm
serviceWeight3880 kg3880 kg
length3885 mm to fork face3885 mm to fork face
width1230 mm1230 mm
tyrePneumatic 7.00-12 (front) / 6.00-9 (rear)Pneumatic 7.00-12 (front) / 6.00-9 (rear)

Rows that differ are marked. Rows without a mark are identical on both builds.

Choose CPC(D)40 when

4.0 t. The frame shared with the electric 4.0 t, which matters for fleets that run both and want one spare-parts stock.

The building is the constraint: floor loading, door width, or a mezzanine that will not take the heavier chassis. CPC(D)40 is also the cheaper unit, so a fleet that never loads to the plate should not pay for the frame it does not use.

CPC(D)40 specification

Choose CPC(D)50 when

5.0 t. Quay and steel-yard work. Check the ground bearing capacity before specifying: the service weight is the constraint, not the load.

The load is the constraint: pallets that arrive over-weight, attachments that shift the centre of gravity forward, or a mast tall enough that residual capacity falls away at height. Buying one size up is cheaper than a second handling step.

CPC(D)50 specification

Not sure which one

Send the aisle width, the load and the lift height. We answer with the model and the reason, not both brochures.